CSI Section "06 46 00" Wood Trim PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. [Interior Wood Door Frames.] 2. [Wood Door and Window Casings.] 3. [Wood Aprons.] 4. [Wood Base and Shoe Moldings.] 5. [Wood Chair Rails.] 6. [Wood Cornices.] 7. [Wood Fascia and Soffits.] 8. [Wood Stops, Stools, and Sills.] 9. [Factory finishing.] B. Related Sections: 1. Rough Carpentry: Wood blocking or grounds inside finished walls or above finished ceilings. 2. Wood Paneling. 3. Wood and Plastic Laminate Casework. 4. Wood Doors. 1.02 REFERENCES A. Minimum standards for work in this Section shall be in conformity with the Architectural Woodwork Standards, latest edition, published jointly by the Architectural Woodwork Institute, the Architectural Woodwork Manufacturer Association of Canada, and the Woodwork Institute. 1.03 SUBMITTALS A. Shop Drawings: 1. Submit shop drawings in conformance with the requirements of the Architectural Woodwork Standards. 2. [Furnish a Woodwork Institute Certified Compliance Label on the first page of the shop drawings]. 3. Submit two copies, one of which will be returned with reviewed notations. Make corrections noted (if any), and distribute required copies prior to the start of work. B. Samples: 1. Submit four [finished] samples of each species and cut of wood to be used. Lumber samples to be minimum 6” by 12”, plywood samples to be minimum 12” by 12”. Samples shall represent the range of color and grain expected to be provided. 2. [Submit four additional samples of each material for the use of the paint trade.] 1.04 QUALITY ASSURANCE A. Work shall be in accordance with the Grade or the Grades Specified of the Architectural Woodwork Standards. B. [Certified Compliance 1. Before delivery to the jobsite the woodwork supplier shall provide a Woodwork Institute Certified Compliance Certificate indicating the millwork products being supplied and Certifying that these products fully meet the requirements of the Grade or Grades specified. 2. Each elevation of casework, each laminated plastic top, and each solid surface top shall bear a Woodwork Institute Certified Compliance Label. 3. At completion of installation the woodwork installer shall provide a Woodwork Institute Certified Compliance Certificate indicating the products installed, and Certifying that the installation of these products fully meets the requirements of the Grade or Grades specified. 4. All fees charged by the Woodwork Institute for their Certified Compliance program are the responsibility of the millwork manufacturer and/or installer and shall be included in their bid.] C. [Monitored Compliance 1. All millwork and the installation thereof for this project shall be monitored for compliance to the contract documents by a Woodwork Institute Director of Architectural Services. a. Full particulars of the Woodwork Institute Monitored Compliance Program may be found at the Institute web site at www.woodworkinstitute.com or by calling the administrative office at (916) 372-9943. 2. Millwork and/or installation found to be non compliant (and not corrected) will be rejected. 3. Issuance of a Monitored Compliance Certificate is a prerequisite of acceptance. 4. All fees charged by the Woodwork Institute for their Certified Compliance program are the responsibility of the millwork manufacturer and/or installer and shall be included in their bid.] D. Qualification: 1. Firm (woodwork manufacturer) with no less than 5 years of production experience similar to this Project, whose qualifications indicate the ability to comply with the requirements of this Section. 2. The woodwork manufacturer must have had at least one project in the past 5 years where the value of the woodwork was within 20 percent of the cost of woodwork for this Project. E. Single Source Responsibility: A single manufacturer shall provide and install the work of this Section. 1.05 DELIVERY, STORAGE, AND HANDLING A. Deliver materials only when the project is ready for installation and the general contractor has provided a clean storage area. 1. Delivery of architectural millwork shall be made only when the area of operation is enclosed, all plaster and concrete work is dry and the area broom clean. 2. Maintain indoor temperature and humidity within the range recommended by the Architectural Woodwork Standards for the location of the project. 1.06 SCHEDULING A. Coordinate fabrication, delivery, and installation with the general contractor and other applicable trades. PART 2 - PRODUCTS 2.01 COMPONENTS A. Lumber shall be sound, kiln dried, and in accordance with the Architectural Woodwork Standards requirements for its use and the Grade specified. B. Particleboard, MDF, and Plywood shall meet the requirements of the AWS for the Grade specified and their intended use. C. Veneered components shall be in accordance with the Architectural Woodwork Standards requirements for the Grade specified. 1. [Core shall be [particleboard] [MDF].] 2. Adhesives used shall be [Type I] [Type II]. 2.02 FABRICATION A. Interior Millwork shall be Architectural Woodwork Standards [Custom] [Premium] Grade. B. Door Jambs shall be [flat jamb with applied stop] [Plowed jamb with a T stop] [rabbeted]. C. Wainscot height shall be [ ___ ] inches above finish floor. D. Trim for opaque finish. 1. Moldings shall be [MDF] [closed grain hardwood]. 2. Flat trim items shall be [MDF] [MDO] [closed grain hardwood veneer]. a. Exposed edges shall be [sanded and filled if necessary] [edge banded with closed grain hardwood veneer]. E. Trim for transparent finish: 1. Moldings shall be [[species], [cut]] [as indicated in the finish schedule]. 2. Exposed faces of veneered items shall be [[species] [cut] [match]] [as indicated in the finish schedule]. F. [Blueprint Match: Work at room(s) [ __________ ] shall be blueprint matched: 1. All work in this/these area(s) shall be AWS Premium Grade. 2. Casework, paneling, doors, and wood trim shall be provided by the same manufacturer. 3. Veneers shall be taken from the same flitch, to be selected by the architect. 4. Faces at cabinet doors, drawer fronts, and false fronts shall be sequence matched, shall run and match vertically, and shall be sequence matched with adjacent wall paneling and/or doors. 5. Faces at exposed ends of cabinets shall be selected from the same flitch, and shall be well matched to the adjacent paneling and to the cabinet fronts. 6. Solid wood elements such as base, casing, and frames shall be well matched for color and grain, and shall be compatible in color and grain with veneered elements. 7. All components including casework, paneling, doors, and trim shall be factory finished at the same time in the same facility.] G. [Factory Finishing 1. [All products provided in this Section shall be factory finished using “Architectural Woodwork Standards” finish system [ _____ ].] 2. [Finish shall be AWS [Premium Grade] [Custom Grade] [the same Grade as the items being finished.] PART 3 - EXECUTION 3.01 EXAMINATION A. Verify the adequacy and proper location of any required backing or support framing. B. Verify that mechanical, electrical, plumbing, and other building components effecting work in this Section are in place and ready. 3.02 INSTALLATION A. Install all work in conformance with the Architectural Woodwork Standards, latest edition. 1. Installation shall conform to the AWS Grade of the items being installed. B. All work shall be secured in place, square, plumb, and level. C. All work abutting other building components shall be properly scribed. D. Mechanical fasteners used at exposed and semi-exposed surfaces shall be countersunk. 3.03 ADJUSTING & TOUCH UP A. All nicks, chips and scratches shall be [sanded out] [filled and re-touched]. Damaged items which cannot be repaired shall be replaced. 3.04 CLEANUP A. Upon completion of installation, the installer shall clean all installed items of pencil and ink marks, and broom clean the area of operation, depositing debris in containers provided by the general contractor. END OF SECTION