CSI Section "06 42 00" Paneling PART 1 - GENERAL 1.01. SUMMARY A. Section Includes: 1. [Solid or Veneered Wood Paneling.] 2. [High Pressure Decorative Laminate Wall Covering.] 3. [Solid Surface Wall Covering.] 4. [Solid Phenolic Wall Covering.] 5. [All furring, blocking, shims, and methods of attachment from the face of the wall out.] 6. [Factory finishing.] B. Excluding: 1. Casework, Soffits or other Filler Panels. 2. Room, Closet, or Access Doors. 3. Any structural wood framing of plywood. 4. Exposed base. C. Related Sections: 1. Rough Carpentry: Wood blocking or grounds inside finished walls or above finished ceilings. 2. Casework. 3. Wood Doors. 4. Wood Trim. 1.02. REFERENCES A. Minimum standards for work in this Section shall be in conformity with the Architectural Woodwork Standards, latest edition, published jointly by the Architectural Woodwork Institute, the Architectural Woodwork Manufacturer Association of Canada, and the Woodwork Institute. 1.03. SUBMITTALS A. Shop Drawings: 1. Submit shop drawings in conformance with the requirements of the Architectural Woodwork Standards. 2. [Furnish a Woodwork Institute Certified Compliance Label on the first page of the shop drawings]. 3. Submit two copies, one of which will be returned with reviewed notations. Make corrections noted (if any), and distribute required copies prior to the start of work. B. Samples: 1. Submit four [finished] samples of each species and cut of wood to be used. Lumber samples to be minimum 6” by 12”, plywood samples to be minimum 12” by 12”. Samples shall represent the range of color and grain expected to be provided. 2. [Submit four additional samples of each material for the use of the paint trade.] C. [Mockups: 1. Provide a mockup of one Section of paneling, including an outside and an inside corner. The mockup shall be of the material and finish to be provided.] 1.04. QUALITY ASSURANCE A. Work shall be in accordance with the Grade or the Grades Specified of the Architectural Woodwork Standards. B. [Certified Compliance 1. Before delivery to the jobsite the woodwork supplier shall provide a Woodwork Institute Certified Compliance Certificate indicating the millwork products being supplied and Certifying that these products fully meet the requirements of the Grade or Grades specified. 2. Each elevation of casework, each laminated plastic top, and each solid surface top shall bear a Woodwork Institute Certified Compliance Label. 3. At completion of installation the woodwork installer shall provide a Woodwork Institute Certified Compliance Certificate indicating the products installed, and Certifying that the installation of these products fully meets the requirements of the Grade or Grades specified. 4. All fees charged by the Woodwork Institute for their Certified Compliance program are the responsibility of the millwork manufacturer and/or installer and shall be included in their bid.] C. [Monitored Compliance 1. All millwork and the installation thereof for this project shall be monitored for compliance to the contract documents by a Woodwork Institute Director of Architectural Services. a. Full particulars of the Woodwork Institute Monitored Compliance Program may be found at the Institute web site at www.woodworkinstitute.com or by calling the administrative office at (916) 372-9943. 2. Millwork and/or installation found to be non compliant (and not corrected) will be rejected. 3. Issuance of a Monitored Compliance Certificate is a prerequisite of acceptance. 4. All fees charged by the Woodwork Institute for their Certified Compliance program are the responsibility of the millwork manufacturer and/or installer and shall be included in their bid.] C. Qualification: 1. Firm (woodwork manufacturer) with no less than 5 years of production experience similar to this Project, whose qualifications indicate the ability to comply with the requirements of this Section. 2. The woodwork manufacturer must have had at least one project in the past 5 years where the value of the woodwork was within 20 percent of the cost of woodwork for this Project. 3. Single Source Responsibility: A single manufacturer shall provide and install the work of this Section. 1.05. DELIVERY, STORAGE, AND HANDLING A. Deliver materials only when the project is ready for installation and the general contractor has provided a clean storage area. 1. Delivery of architectural millwork shall be made only when the area of operation is enclosed, all plaster and concrete work is dry, and the area broom clean. 2. Maintain indoor temperature and humidity within the range recommended by the Architectural Woodwork Standards for the location of the project. 1.06. SCHEDULING A. Coordinate fabrication, delivery, and installation with the general contractor and other applicable trades. PART 2 - PRODUCTS 2.01. COMPONENTS A. Meeting the requirements of the Architectural Woodwork Standards. 1. Lumber shall be sound and kiln dried. a. Exposed lumber shall be [[species], [cut]] [closed grained hardwood]. 2. Veneer shall be [species] [cut] [[book] [slip]] matched. 3. Panels for opaque finish shall be [MDO] [MDF] [closed grain hardwood veneer]. 4. Core material for laminated panels shall be [MDF] [Particleboard]. 5. Laminate shall be [manufacturer] [pattern]. 6. Solid surface shall be [manufacturer] [pattern]. a. All solid surface at any room or area shall be from the same batch to prevent color mismatch. 7. Solid Phenolic shall be [manufacturer] [pattern]. 2.02 FABRICATION A. Paneling shall be Architectural Woodwork Standards [Economy] [Custom] [Premium] Grade. B. Stile and Rail Wood Paneling: 1. Stiles and rails shall be [3/4] [1] inch thick. 2. Joints at stiles and rails shall be securely fastened with dowels or biscuits. 3. Panels shall be [flat] [raised]. C. Flat Veneered Paneling: 1. Panels shall be [full width] [selectively reduced] [balanced sequence matched panels] [blueprint matched]. 2. Visible edges and reveals shall be [filled and painted] [match faces] [per details]. 3. Outside corners shall be [lock mitered] [mitered and splined] [per detail]. 4. [Blueprint Match: Work at room(s) [ __________ ] shall be blueprint matched. a. All work in this/these area(s) shall be AWS Premium Grade. b. Casework, paneling, doors and wood trim shall be provided by the same manufacturer. c. Veneers shall be taken from the same flitch, to be selected by the architect. d. Faces at cabinet doors, drawer fronts, and false fronts shall be sequence matched, shall run and match vertically, and shall be sequence matched with adjacent wall paneling and/or doors. e. Faces at exposed ends of cabinets shall be selected from the same flitch, and shall be well matched to the adjacent paneling and to the cabinet fronts. f. All components including casework, paneling, doors, and trim shall be factory finished at the same time in the same facility.] D. High Pressure Decorative Laminate Paneling: 1. Panels shall be [full width -OR- selectively reduced]. 2. Visible edges and reveals shall be [filled and painted] [match faces] [per details]. 3. Outside corners shall be [lock mitered] [mitered and splined] [per detail]. E. Solid Surface Paneling: 1. Panels shall be [manufacturer], [pattern]. 2. Reveals shall be provided for expansion a maximum of 96” (2438 mm) on center. 3. Reveals shall be [butt jointed and caulked] [covered with a trim batten] [splined with a loose spline]. 4. Outside corners shall be [hard seamed] [per details]. F. Solid Phenolic Core Paneling: 1. Reveals or slip joints shall be provided for expansion a maximum of 96” (2438 mm) on center. 2. Reveals shall be [butt jointed and caulked] [be provided with a trim batten]. 3. Outside corners shall be [butt jointed] [trimmed with a metal corner mold] [per details]. G. [Factory Finishing: 1. All products provided in this Section shall be factory finished using Architectural Woodwork Standards finishing system [ _____ ]. 2. Finish shall be AWS [Premium] [Custom] Grade.] PART 3 - EXECUTION 3.01. EXAMINATION A. Verify the adequacy and proper location of blocking and support framing. B. Verify that mechanical, electrical, plumbing, and other building components (supplied by others), affecting work in this Section are in place and ready. 3.02. INSTALLATION A. Install all work in conformance with the Architectural Woodwork Standards, latest edition. 1. Installation shall conform to the AWS Grade of the items being installed. B. All work shall be secured in place, square, plumb, and level. C. All work abutting other building components shall be properly scribed. D. Mechanical fasteners at exposed and semi-exposed surfaces shall be countersunk and filled. 3.03. ADJUSTING & TOUCH UP A. All nicks, chips, and scratches shall be [sanded smooth] [filled and retouched]. Damaged items that cannot be repaired shall be replaced. 3.04. CLEANUP A. Upon completion of installation, the installer shall clean all installed items of pencil and ink marks, and broom clean the area of operation, depositing debris in containers provided by the general contractor. END OF SECTION